![](https://static.wixstatic.com/media/4f6990_1578091ca11147f5bab8acd66ec92740~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_1578091ca11147f5bab8acd66ec92740~mv2.webp)
![Acrow Bridge over the Hutchinson River Parkway](https://static.wixstatic.com/media/4f6990_1578091ca11147f5bab8acd66ec92740~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_1578091ca11147f5bab8acd66ec92740~mv2.webp)
Acrow Bridge over the Hutchinson River Parkway
Siefert Associates, LLC was contracted by Tyrek Heights Erectors to provide an engineered lift plan for the erection and launch of an...
![](https://static.wixstatic.com/media/4f6990_2e82d938a5a540ce962a9410b4204520~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_2e82d938a5a540ce962a9410b4204520~mv2.webp)
![Freedom Tower (2007-2010)](https://static.wixstatic.com/media/4f6990_2e82d938a5a540ce962a9410b4204520~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_2e82d938a5a540ce962a9410b4204520~mv2.webp)
Freedom Tower (2007-2010)
From 2007 to 2010, Siefert Associates, LLC provided demolition & erection plans to Skanska USA, slurry wall analysis, permanent splice...
![](https://static.wixstatic.com/media/4f6990_b8487016d4134b4eb09f21d022b6bb8c~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_b8487016d4134b4eb09f21d022b6bb8c~mv2.webp)
![Gordie Howe International Bridge](https://static.wixstatic.com/media/4f6990_b8487016d4134b4eb09f21d022b6bb8c~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_b8487016d4134b4eb09f21d022b6bb8c~mv2.webp)
Gordie Howe International Bridge
In September 2020, Siefert Associates, LLC was selected by BNA Constructors to design a custom lifting frame for inclined C-shaped rebar...
![](https://static.wixstatic.com/media/4f6990_6947b296e8d5414492187bcd37ef6edf~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_6947b296e8d5414492187bcd37ef6edf~mv2.webp)
![LaGuardia Airport – Tower Crane Foundation](https://static.wixstatic.com/media/4f6990_6947b296e8d5414492187bcd37ef6edf~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_6947b296e8d5414492187bcd37ef6edf~mv2.webp)
LaGuardia Airport – Tower Crane Foundation
Siefert Associates, LLC provided tower crane design services to Stonebridge Steel Erection to facilitate the new concourse construction...
![](https://static.wixstatic.com/media/4f6990_8cf8a7360ed645e3b32e86a179632bec~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_8cf8a7360ed645e3b32e86a179632bec~mv2.webp)
![Route 7 Hackensack River Wittpenn Bridge](https://static.wixstatic.com/media/4f6990_8cf8a7360ed645e3b32e86a179632bec~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_8cf8a7360ed645e3b32e86a179632bec~mv2.webp)
Route 7 Hackensack River Wittpenn Bridge
Siefert Associates, LLC was awarded a contract by Atlantic Coast Dismantling to demolish the Wittpenn Bridge. The vertical-lift bridge...
![](https://static.wixstatic.com/media/4f6990_a4091da09a174abdae178a34df4abbbe~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_a4091da09a174abdae178a34df4abbbe~mv2.webp)
![Raritan River Bridge Replacement](https://static.wixstatic.com/media/4f6990_a4091da09a174abdae178a34df4abbbe~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_a4091da09a174abdae178a34df4abbbe~mv2.webp)
Raritan River Bridge Replacement
Siefert Associates, LLC has been providing structural and geotechnical engineering services such as bulkhead design, trestle design, and...
![](https://static.wixstatic.com/media/4f6990_e014b96ad7014b02b220983e70c37ccb~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_e014b96ad7014b02b220983e70c37ccb~mv2.webp)
![Harbor Brook Overflow Culvert at Amtrak Railroad](https://static.wixstatic.com/media/4f6990_e014b96ad7014b02b220983e70c37ccb~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_e014b96ad7014b02b220983e70c37ccb~mv2.webp)
Harbor Brook Overflow Culvert at Amtrak Railroad
Siefert Associates, LLC provided support of excavation design services to Empire Paving to facilitate the construction of drainage...
![](https://static.wixstatic.com/media/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.webp)
![North Washington Street Bridge Demolition](https://static.wixstatic.com/media/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.webp)
North Washington Street Bridge Demolition
Atlantic Coast Dismantling has recently completed the removal of the swing span trusses of the historic North Washington Street Bridge in...
![Continuing Education Virtually](https://static.wixstatic.com/media/4f6990_ecf724301ae04f1fbeff9ab2cc3902d6~mv2.png/v1/fill/w_180,h_180,fp_0.50_0.50,q_95,enc_auto/4f6990_ecf724301ae04f1fbeff9ab2cc3902d6~mv2.webp)
Continuing Education Virtually
Siefert Associates has been taking advantage of the virtual continuing education opportunities available! This week, our Structural...
![](https://static.wixstatic.com/media/4f6990_e3ce06cc7e7a46ab901c7d92cd8fbfdf~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_e3ce06cc7e7a46ab901c7d92cd8fbfdf~mv2.webp)
![Curved Girder Bridge Erection Virtual Seminar](https://static.wixstatic.com/media/4f6990_e3ce06cc7e7a46ab901c7d92cd8fbfdf~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_e3ce06cc7e7a46ab901c7d92cd8fbfdf~mv2.webp)
Curved Girder Bridge Erection Virtual Seminar
Siefert Associates, LLC has teamed up with Collins Engineering, presenters Michael Garlich and Michael Haas, to provide a monthly virtual...