top of page

I-95 Providence Viaduct

Now that the demolition procedures engineered by Siefert Associates, and carried out by J.R. Vinagro Corporation, have been successfully completed on the southbound I-95 Providence Viaduct, the SA team has been tasked with tackling the northbound side. Through the use of excavators, loaders and cranes, determined by JRV’s preferences and the engineering requirements, the existing deck will be demolished and the existing post-tensioned steel girders will be methodically cut and removed to make room for the new northbound I-95 and C-D road structures. Our comprehensive knowledge of bridge dismantling, combined with efficient structural analysis, clear working drawings and impressive capabilities by our clients provide safe and predictable field operations.

Photos show existing I-95 Providence Viaduct and JRV’s equipment on site.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page