North Washington Street Bridge Demolition
Atlantic Coast Dismantling has recently completed the removal of the swing span trusses of the historic North Washington Street Bridge in Boston, MA using working drawings from Siefert Associates. The roadway and smaller members were removed by excavators on bridge and then large sections of the truss were cut and lifted out with a barge crane on the river below.
![](https://static.wixstatic.com/media/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/4f6990_4de9eeae9bbb4377b874344b58e60967~mv2.jpg)