![Kew Gardens Interchange Infrastructure and Operational Improvement Project – Bridge 3 Demolition](https://static.wixstatic.com/media/4f6990_b727a8c7a3fe435194e7cb983d6114be~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_b727a8c7a3fe435194e7cb983d6114be~mv2.webp)
Kew Gardens Interchange Infrastructure and Operational Improvement Project – Bridge 3 Demolition
Siefert Associates, LLC prepared working drawings for Halmar International to demolish a portion of an existing 63’ long concrete arch...
![](https://static.wixstatic.com/media/4f6990_63307c656fb04adab9e45f4a9e5e5a11~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_63307c656fb04adab9e45f4a9e5e5a11~mv2.webp)
![Siefert Hits the Slopes!](https://static.wixstatic.com/media/4f6990_63307c656fb04adab9e45f4a9e5e5a11~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_63307c656fb04adab9e45f4a9e5e5a11~mv2.webp)
Siefert Hits the Slopes!
Last month, the Siefert team assembled for the annual ski trip! We had a fun packed snowy weekend of skiing, snowshoeing, and tubing at...
![](https://static.wixstatic.com/media/4f6990_1da97f0e458542e5b6deecbe4ae49f17~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_1da97f0e458542e5b6deecbe4ae49f17~mv2.webp)
![Atlantic Street](https://static.wixstatic.com/media/4f6990_1da97f0e458542e5b6deecbe4ae49f17~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_1da97f0e458542e5b6deecbe4ae49f17~mv2.webp)
Atlantic Street
Siefert Associates, LLC prepared working drawings for Halmar International to erect two [2] steel girders for a proposed pedestrian...
![](https://static.wixstatic.com/media/4f6990_ba706686d1c64ce98aac6e47c26e82fa~mv2.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/4f6990_ba706686d1c64ce98aac6e47c26e82fa~mv2.webp)
![Henry Hudson Bridge](https://static.wixstatic.com/media/4f6990_ba706686d1c64ce98aac6e47c26e82fa~mv2.jpg/v1/fill/w_319,h_240,fp_0.50_0.50,q_90,enc_auto/4f6990_ba706686d1c64ce98aac6e47c26e82fa~mv2.webp)
Henry Hudson Bridge
In January of 2020, Restani Construction, with the help of their steel subcontractor Northeast Steel Erector, installed the Stage 2...