top of page

Integrated Structures - Mezzanine Frame Erection

  • Kevin O'Neill
  • May 25, 2018
  • 1 min read

In April 2018, Integrated Structures erected the Mezzanine Frame of the 62nd Street Station of the Sea Beach Line in NYC using cranes, temporary supports with jacking system and Goldhofer SPMT designed by Siefert Associates.

 
 
 

Comentários


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page