top of page

Temporary Roadway Bridge Removal

  • Kevin O'Neill
  • Jul 10, 2020
  • 1 min read

Siefert Associates, LLC provided the crane & rigging engineering necessary for Kubricky Construction to remove the temporary roadway bridge shown. The bridge was part of the phase 1 construction of the precast tunnel project in the small town of Middlebury, VT.

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page