Atlantic Coast Dismantling
- Kevin O'Neill
- Jun 22, 2020
- 1 min read
In June, Siefert Associates, LLC was selected by Atlantic Coast Dismantling to perform a stability analysis and rigging design for the emergency removal of a failing concrete bridge in Brookline, MA. The 120 kip bridge was successfully removed from its abutments in one lift using a 500 ton hydraulic crane. The bridge was set on the ground in an adjacent park for complete demolition and removal from the site.

Komentáře