top of page

GWB Barrier Replacement

  • Kevin O'Neill
  • Apr 20, 2020
  • 1 min read

Siefert Associates, LLC is continuing to work with Skanska USA Civil to provide construction engineering services related to the barrier and sidewalk replacement on the George Washington Bridge. This requires the design of a security enclosure in addition to the removal of the sidewalk and existing barrier and installation of the new barrier.

 
 
 

Commentaires


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page