top of page

George Washington Bridge Sidewalk Replacement


Siefert Associates is continuing to work with Skanska USA Civil to provide construction engineering services related to the sidewalk replacement on the George Washington Bridge. The replacement requires a means of access for the workers while the existing sidewalk is demolished. Siefert Associates designed a temporary walkway/platform outside of the existing fascia girder to safely provide quick and easy access throughout the construction sequence.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page