George Washington Bridge Sidewalk Replacement
- Kevin O'Neill
- Oct 28, 2019
- 1 min read

Siefert Associates is continuing to work with Skanska USA Civil to provide construction engineering services related to the sidewalk replacement on the George Washington Bridge. The replacement requires a means of access for the workers while the existing sidewalk is demolished. Siefert Associates designed a temporary walkway/platform outside of the existing fascia girder to safely provide quick and easy access throughout the construction sequence.
Comments