top of page

George Washington Bridge Sidewalk Replacement

  • Kevin O'Neill
  • Oct 28, 2019
  • 1 min read

Siefert Associates is continuing to work with Skanska USA Civil to provide construction engineering services related to the sidewalk replacement on the George Washington Bridge. The replacement requires a means of access for the workers while the existing sidewalk is demolished. Siefert Associates designed a temporary walkway/platform outside of the existing fascia girder to safely provide quick and easy access throughout the construction sequence.

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page