430 East 58th St Building
Siefert Associates, LLC performed an inspection of the new 430 East 58th St building in Manhattan this September on the building’s PERI Perimeter Protection Systems. The Peri formwork scaffolding engineering Pty Ltd provided systems were designed to provide worker access and fall protection during construction and were installed by the construction team of PINNACLE INDUSTRIES II, LLC. At the time of inspection, the PERI systems were installed on the 25th floor, but they will continue to climb with the structure as more floors are constructed.