top of page

Newark Liberty Airport

  • Aug 8, 2019
  • 1 min read

Earlier this summer at the Terminal A Redevelopment Program at Newark Liberty Airport, Stonebridge Steel Erection erected main terminal steel with a Manitowoc 2250 crawler crane using working drawings prepared by Siefert Associates, LLC. The crawler crane is to operate on a 575ft [±] x 40ft crane pad, and is to erect steel out to 160ft radius. Photos below taken during crane foundation inspection, performed by Siefert Associates, LLC.

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page