top of page

Route 32 over Nininger Road Steel Erection

  • Kevin O'Neill
  • Jul 15, 2019
  • 1 min read

In May 2019, Siefert Associates, LLC provided engineering services for steel erection Route 32 over Nininger Road in Monroe, NY. The project featured erection of girders (G11 to G24) using a Manitowoc 11000-1 crawler crane, girder stability during erection, rigging and temporary bracing from Siefert Associates. The max girder weighed roughly 17k and measured 60’ in length.

 
 
 

Comentarios


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page