top of page

Henry Hudson Bridge in New York City

Restani Construction, with plans from Siefert Associates, has begun concrete deck demolition operations for the existing lower level structure at the southern approach of the Henry Hudson Bridge in New York City. As part of Stage 1 construction, the demolition of the existing structure allows for the installation of temporary shoring towers, design by Siefert Associates, to support the upper level roadway and the eventual construction of a new concrete substructure.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page