North Washington Street Bridge, Boston MA
In October 2018, Siefert Associates, LLC submitted the West Sidewalk Demolition plans required for the North Washington Street bridge replacement in Boston, MA. The first phase of demolition will allow for construction of a temporary bridge; the remainder of the bridge will be dismantled during 2019.
![](https://static.wixstatic.com/media/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg)
![](https://static.wixstatic.com/media/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg)
![](https://static.wixstatic.com/media/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/0830cc_7088dde3f470477587c3639575f08b26~mv2_d_4032_3024_s_4_2.jpg)