Green Line Extension
Green Line Extension (GLX) Constructors recently installed the Siefert Associates’ designed temporary supports for the new utility girders adjacent to Medford Street in Somerville, MA. The temporary supports had to be designed in a very narrow corridor outside of the MBTA railroad envelope and had to match the large skew of the existing wingwall.
![](https://static.wixstatic.com/media/0830cc_44b34b9d87fc45a0bd8647ea4e5cffb5~mv2_d_3024_4032_s_4_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/0830cc_44b34b9d87fc45a0bd8647ea4e5cffb5~mv2_d_3024_4032_s_4_2.jpg)