top of page

Henry Hudson Bridge

Restani Construction Co., with plans from Siefert Associates, completed concrete deck demolition operations for the existing upper level structure at the southern approach of the Henry Hudson Bridge in New York City. As part of the Stage 1 construction, they completed selective demolition of the existing concrete deck south of Bent U7 and West of the bridge centerline to allow for the erection of the future upper level superstructure.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page