top of page

Governor Mario M. Cuomo Bridge

Siefert Associates, LLC completed working drawings and calculations for lift plans and temporary support for the 200-foot super gantry for Tappan Zee Constructors, LLC at the Mario M. Cuomo Bridge over NY’s Hudson River. Supporting steel is currently in fabrication and is scheduled to arrive on site in late August. A tower-crane tower frame piece has been utilized as part of the temporary support for the super-gantry in lieu of fabricating new steel.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page